Powers Ferry Corridor Alliance
  • Home
    • Code amendments - Withdrawn
  • About PFCA
  • PFCA Events
    • Adopt-A-Mile Cleanup
  • Master Plan
  • Development
    • ExtraSpace Storage
    • OLD Kroger Site
    • MarketPlace Terrell Mill
    • Bentley Road
    • Bob Callan Trail
    • The Heights At Shadowood
    • Bexley And Overture
    • 1300 Parkwood Circle
  • Schools
  • Membership
  • Contact

Bentley Road

Formerly the Windy Hill - Terrell Mill Connector    


4-lane shortcut links key local roads.

Includes multi-use trail that connects with Bob Callan
Formerly called the Windy Hill-Terrell Mill Connector, it is now called Bentley Road. This makes sense, since it's an extension of... Bentley Road. The .8 mile stretch extends Bentley Road south from Terrell Mill Road to Windy Hill Road. South of Windy Hill, it becomes Interstate North Parkway. As a shortcut between Windy Hill and Terrell Mill Roads, it absorbs significant traffic that would otherwise end up on Powers Ferry Road. 

Of note, the project includes a multi-use trail on the west shoulder. This will soon connect to the Bob Callan Trail system, which ultimately hooks up with the Chattahoochee River National Recreation Area trails. In January of 2024, construction began on the final stretch of the Bob Callan Trail. The 0.3-mile segment is scheduled to be finished in early 2025. Get more information on our Bob Callahan Trail page.
Picture
Picture
Picture

​Related content:

AJC 12-16-19
Marietta Daily Journal 11-16-18
East Cobb News
 6-27-18
​CobbCounty.org Project Update

Sign up for email updates on the Powers Ferry Corridor.​​

Ribbon cutting on Oct. 13, 2022

Open to traffic Oct. 14th!  ​Story in East Cobb News
Picture
Picture
PFCA President Patti Rice speaks at the ribbon cutting.
Picture
Extension of Bentley Road looking north from its intersection with Windy Hill Road. Below Windy Hill, it continues as Interstate North Parkway.
Picture
Extension of Bentley Road south of Terrell Mill Road.
Picture
Extension of Bentley Road between Windy Hill and Terrell Mill.

The 4-lane roadway will have a multi-use trail and a sidewalk.
Picture

Contact PFCA
Site powered by Weebly. Managed by Bluehost